We PaveWhatNairobiDrives On.
Hot-mix overlay · Cabro interlocking · Drainage grading · Line marking — every surface rolled smooth enough to read a spirit level by moonlight.
We price from 150 square metres upward — roughly the footprint of a standard double garage bay. Below that threshold, mobilisation costs outweigh material savings and we'd be doing you a disservice. Our sweet spot is commercial work between 500 m² and 15,000 m²: the parking deck of a Westlands retail block, a logistics yard off Mombasa Road, or a county market access road running 400 metres of 5-metre carriageway. For residential driveways under 150 m², we maintain a referral list of vetted small-works contractors we trust.
Mombasa Road service lane frontage — 2,400 m², 380 tonnes hot-mix AC-14, completed in 9 working days.
Yes — with conditions. Hot-mix asphalt requires surface temperature above 10 °C and no standing water at the point of lay. Nairobi's long rains (March–May) rarely drop below that threshold, but we monitor the KMD 48-hour forecast and will pause a pour if rainfall exceeds 8 mm/hr. We schedule rain-season contracts with a 15% time buffer built into the programme. Interlocking cabro is actually better laid in overcast conditions — the reduced UV slows curing and lets the bedding sand settle evenly. In short: we don't down tools at the first cloud, but we won't chase a deadline into a flooded sub-base.
Ready to discuss your site? Request a Site Survey
Request a Site Survey→We manage the full Nairobi County road-opening permit process on your behalf — Form RD-7 submission, traffic management plan, and reinstatement bond where required. Our liaison officer has standing relationships with the relevant county engineers in Embakasi, Westlands, Langata, Starehe, and Ruaraka sub-counties. For projects touching a classified road (Kenya National Highways Authority jurisdiction), we coordinate the KeNHA lane-closure notification simultaneously. Permit timelines average 8–14 working days; we factor this into your programme from day one so it never sits on the critical path.
Kilimani mixed-use courtyard — 620 m² cabro herringbone, 80mm Class A blocks, drainage channels cut to 0.5% fall. 11 days.
Our default overlay is AC-14 dense-graded hot-mix asphalt to Kenya Roads Board Specification 2021, laid at 50 mm compacted depth for light commercial traffic and 75 mm for heavy-vehicle yards. For trailer courts and container depots where axle loads exceed 25 tonnes, we design a full-depth reconstruction using a 200 mm crushed-stone sub-base (CBR ≥ 80%), 150 mm wet-mix macadam base, and a 75 mm AC-20 binder course before the wearing surface. Every mix design is Marshall-tested at our partnered KEBS-accredited lab in Industrial Area before a single tonne leaves the plant. We'll share the test certificates with you before mobilisation.
Always. A flat surface is a failed surface — water is the primary cause of premature potholing on Nairobi's commercial lots. Every quotation includes a topographic survey and a 1% minimum cross-fall design. We tie into existing drainage channels, install kerb inlets where required, and can construct French-drain soakaways for plots where the county drain is below the finished surface level. Line marking, reflective road studs, and speed-control hump construction are quoted as line items so you can include or exclude them cleanly.
Thika Road commercial frontage — drainage grading + 1,800 m² overlay, 290 tonnes AC-14. Cross-fall verified to 1.2% post-compaction.
Bring us your drawings or just your GPS pin — Request a Site Survey
Request a Site Survey→Standard mobilisation is 10 working days from signed letter of award and receipt of advance payment — this covers plant booking, material procurement, and permit lodging. For urgent resurfacing (pothole failure on a live logistics yard, for instance), we maintain a rapid-response slot each week that can mobilise in 3 working days for works under 500 m². We operate our own fleet: two 10-tonne tandem rollers, a Wirtgen W100 milling machine, a paver with 4.5 m screed, and a bowser truck — no subcontracted plant delays.
Industrial Area logistics depot — emergency resurfacing, 340 m², mobilised in 3 days, operational within 24 hours of final roll.
We quote on a schedule-of-rates basis for projects where scope may vary (typical of county road contracts), and as a lump sum for defined commercial lots where drawings exist. Our published rates for the 2025/26 financial year: hot-mix overlay at 50 mm runs KES 2,850–3,400 per m² depending on access and haul distance from the plant; cabro 80mm interlocking runs KES 3,100–3,800 per m² installed including sand bed and edge restraints; milling and disposal is KES 650 per m². All rates are exclusive of VAT and county permit fees. We do not charge a mobilisation fee separately — it is absorbed into the unit rates.
We provide a 24-month defects liability period on all works, covering failures attributable to workmanship or materials — cracking, delamination, rutting under designed load. The warranty explicitly excludes damage from overloading beyond the design axle load, third-party utility works that disturb the formation, and acts of God (flooding above the design storm event). At the 12-month mark, we conduct a free visual inspection and issue a condition report. If you've retained us on a maintenance contract, we'll address minor edge cracking and patching within the warranty period at no extra charge.
Download Our Paving Standards
A 14-page PDF covering our mix design specifications, compaction tolerances, drainage gradients, and warranty conditions — the same document we hand to county quantity surveyors and structural engineers before tender award.
Every project starts with a free site survey — Request yours now
Request a Site Survey→Request a Site Survey
We'll visit your site within 5 working days, take levels, assess the sub-base, and return a fixed-price quotation with a programme — at no cost and no obligation.